Schedule and CPM

Edit the project schedule in the browser with a grid and a Gantt chart, reschedule on our servers, and use the same network in every simulation iteration.

How It Works

  1. Bring the Schedule In

    Import a Primavera P6 XER, a P6 XML or an MS Project XML schedule into a project, or open one in the schedule editor and save it to the project.

  2. Edit

    Change names, durations, percent complete, calendars, constraints and status in the grid. Insert, indent and outdent, and copy and paste WBS branches.

  3. Draw Logic

    Drag bars to move or stretch them, and draw links on the Gantt.

  4. Reschedule

    Rescheduling runs the CPM on our servers, with longest path, Must Finish By and loop detection.

  5. See Risk on the Bars

    After a run, the Gantt shows P10–P90 bars and a hover card with P50, P80 and criticality.

Details

What You Get

  • Finish-to-start, start-to-start, finish-to-finish and start-to-finish links.
  • Constraints: Must Start On, Start On or After, Start On or Before, the same three for finish, As Late As Possible, and Mandatory Start and Finish.
  • Calendars read from P6 and editable in the product.
  • Resources and assignments with three rate sets.
  • Undo and redo, find and replace, filters, conditional formats and totals.
  • Export to XER, MS Project XML and UN/CEFACT NetworkSchedule, and to Excel, CSV and PDF with the Gantt.

Limits and Conditions

  • A schedule from MS Project XML is stored as an XER, so lags shorter than an hour and lags in elapsed time are not kept.
  • One baseline per schedule.
  • New WBS nodes cannot be created in the editor.
  • Grid layouts are kept in the browser, not with your account.
  • No phone or tablet layout.
  • Editing needs Risk Manager rank or an analyst seat. Others see a read-only grid.

Calendar Risks and Weather

Model downtime as a calendar: a seasonal shutdown, recurring events, a daily chance, or downtime built from historical weather at the site.

  • Four types: Seasonal Shutdown, Recurring Events, Daily Chance and From Weather History.
  • Weather downtime calendars built from ERA5 historical data for a location, with thresholds for rain, wind and low temperature.
  • Map a calendar risk to activities and the run overlays its downtime in each iteration.
  • AI Insights reads a calendar against the plan.

Limits and Conditions

  • Weather data is fetched through our servers, and a locked-down private deployment can switch it off.

Schedule Quality

Check a schedule before it goes into a simulation, with the DCMA 14-point assessment and schedule warnings.

  • DCMA-14 checks and schedule warnings, exportable to Excel.
  • An AI review of schedule quality and an AI narrative of the schedule.

Limits and Conditions

  • Warnings cannot be accepted and saved. Each check shows the schedule as it is now.
  • The Baseline Execution Index check does not use the stored baseline.